Lahontan Gold (TSX.V:LG)
Announced the first results from the 2025 Phase Two drilling program at the Company’s flagship Santa Fe Mine Project located in Nevada’s prolific Walker Lane.
Lahontan has received analytical results for six reverse-circulation rotary (“RC”) drill holes totaling 994 metres. Continue reading








