Scorpio Gold exceeds production guidance

Scorpio Gold Corporation {TSX.V: SGN} announced its operating results for the full year and the fourth quarter (“Q4”) of 2016 at its 70% owned Mineral Ridge project, located in Nevada.

Total gold production in 2016 was 36,879 ounces, exceeding the Company’s high end guidance of 35,000 by 1,879 ounces, or 5%

 

 

Jan 11, 2017

Scorpio Gold Reports Annual Gold Production Exceeding Guidance at the Mineral Ridge Operation, Nevada

    Vancouver, January 11, 2017 – Scorpio Gold Corporation {TSX.V: SGN} announces its operating results for the full year and the fourth quarter (“Q4”) of 2016 at its 70% owned Mineral Ridge project, located in Nevada.

    Total gold production in 2016 was 36,879 ounces, exceeding the Company’s high end guidance of 35,000 by 1,879 ounces, or 5%. The annual production for 2016 of 36,879 ounces represented a decrease of 7% over the prior year.

    Gold production in Q4 2016 totalled 8,301 ounces representing a decrease of 13% from Q4 2015. Mine production decreased in 2016 due to mining 24% fewer ore tonnes at 5% lower grades in the Mary LC and satellite pits, as compared to the prior year. Ore tonnes crushed and placed on the pad were 5% lower in 2016 compared to 2015 as a result of fewer tonnes mined which was offset by a larger initial ore stockpile inventory at the beginning of 2016.

    Chris Zerga, President, comments, “We are proud to report that we have exceeded the high end of our production guidance of 30,000-35,000 ounces for 2016 with 36,879 gold ounces produced at Mineral Ridge in 2016. Scorpio Gold has now completed five years of production at Mineral Ridge, consistently meeting or exceeding annual guidance, while maintaining a safe working environment for our employees and contractors. I would like to thank the entire production team who continue to make the Mineral Ridge operation a success.”

    Key Operating Statistics

    Three Months Ending Dec 31 Twelve Months Ending Dec 31
    2016 2015 Change 2016 20154 Change
    Mining operations
    Mary LC pit
    Ore tonnes mined 148,161 119,891 23.6% 553,402 203,468 172.0%
    Waste tonnes mined 977,246 743,394 31.5% 3,519,285 1,684,728 108.9%
    Total mined 1,125,407 863,285 30.4% 4,072,687 1,888,196 115.7%
    Strip Ratio 6.6 6.2 6.5% 6.4 8.3 -22.9%
    Satellite pits
    Ore tonnes mined 6,028 245,569 -97.5% 196,802 487,234 -59.6%
    Waste tonnes mined 5,888 769,186 -99.2% 525,491 2,045,787 -74.3%
    Total mined 11,916 1,014,755 -98.8% 722,293 2,533,021 -71.5%
    Strip Ratio 1.0 3.1 -67.7% 2.7 4.2 -35.7%
    Mary pit
    Ore tonnes mined 0.0% 202,002 -100.0%
    Waste tonnes mined 0.0% 1,053,992 -100.0%
    Total mined 0.0% 1,255,994 -100.0%
    Strip Ratio 0.0% 5.2 -100.0%
    Total producing pits
    Ore tonnes mined 154,189 365,460 -57.8% 750,204 892,704 -16.0%
    Waste tonnes mined 983,134 1,512,580 -35.0% 4,044,776 4,784,507 -15.5%
    Total mined 1,137,323 1,878,040 -39.4% 4,794,980 5,677,211 -15.5%
    Strip Ratio 6.4 4.1 56.1% 5.4 5.4 0.0%
    Pits under development
    Ore tonnes mined 0.0% 92,146 -100.0%
    Waste tonnes mined (pre-stripping) 160,672 100.0% 309,902 1,995,432 -84.5%
    Total mined 160,672 100.0% 309,902 2,087,578 -85.2%
    Total mining operations
    Ore tonnes mined 154,189 365,460 -57.8% 750,204 984,850 -23.8%
    Waste tonnes mined 1,143,806 1,512,580 -24.4% 4,354,678 6,779,939 -35.8%
    Total mined 1,297,995 1,878,040 -30.9% 5,104,882 7,764,789 -34.3%
    Processing
    Tonnes processed 142,101 265,017 -46.4% 846,140 891,997 -5.1%
    Gold head grade (g/t) 1.37 1.66 -17.5% 1.44 1.52 -5.3%
    Ounces produced
    Gold 8,301 9,503 -12.6% 36,879 39,690 -7.1%
    Silver 4,074 4,905 -16.9% 16,950 19,742 -14.1%
    Crusher throughput (tonnes per day) 1,545 2,881 -46.4% 2,312 2,444 -5.4%
    Recoverable(1) gold (ounces) placed on pad 4,301 9,434 -54.4% 26,549 29,189 -9.0%

    (1) A weighted average metallurgical recovery factor has been applied to the estimated contained ounces crushed and placed on the leach pad based on the pit from which the ore was mined.

    About Scorpio Gold

    Scorpio Gold holds a 70% interest in the Mineral Ridge gold mining operation located in Esmeralda County, Nevada with joint venture partner Elevon, LLC (30%). Mineral Ridge is currently in production as a conventional open pit mining and heap leach operation. The Mineral Ridge property is host to multiple gold-bearing structures, veins and lenses at exploration, development and production stages. Scorpio Gold also holds a 100% interest in the advanced exploration-stage Goldwedge property in Manhattan, Nevada, with a fully permitted underground mine and 400 ton per day mill facility. The Goldwedge mill facility has been placed on a care and maintenance basis and can be restarted immediately when needed.

    Scorpio Gold’s Chairman, Peter J. Hawley, PGeo,, is a Qualified Person as defined by National Instrument 43-101 and has reviewed and approved the content of this release.

    ON BEHALF OF THE BOARD
    SCORPIO GOLD CORPORATION

    Chris Zerga,
    President