Calidus Resources (ASX: CAI) is pleased to declare commercial production at the Warrawoona Gold Project. The processing plant is now operating at nameplate capacity.
A total of 191,000t @ 0.85g/t was processed in December with 5,053 ozs of gold produced. Continue reading